01Blog · N-10 · Materials

Brick, blockor frame?

Note
N-10
Date
02 Aug 2026
Category
Materials
Reading
7 min
Sunway City

Most buildings here could stand up in any of the three. The choice is about money, speed and what the rooms need to do, and it is better made before the engineer starts than after.

1.0

What each is good at

Fired brick is forgiving, familiar to every bricklayer and quiet to live behind. Concrete block goes up faster and straighter but wants plaster and good detailing at openings. A concrete frame with infill costs more, and buys you big openings, upper floors and walls you can move later.

Frame: the walls stop carrying the building.

2.0

How we help you choose

We price the same drawing two ways when the answer is not obvious, so the decision is made on figures and not on habit.

Same drawing, two prices.

Bring us the sketch before the structure is fixed, and we will tell you what each route costs.

N-10 · Drafted note, placeholder photograph · confirm before publishing

03In short

Inshort.

  1. 01

    Brick is forgiving

    Familiar, quiet, and slower.

  2. 02

    Block is fast

    Straighter and quicker, and it wants good plaster and detailing.

  3. 03

    Frame buys freedom

    Big openings, upper floors, walls you can move later.

Not sure which suits your building? We price the same drawing two ways.

Bring us the sketch↗

04Next note

N-09 · Method · 4 min

Building
before
the rains.

Why the programme is planned backwards from November, not forwards from today.

All notes