01Projects · the register

Drawn, built,and stillstanding.

Register A
Residential
Register B
Commercial
Register C
Civil
Register D
Renovation

02The set

One project
at a time.

Five from the register, each given the whole sheet.

01 / 05 · Hospitality

Kanyemba
Lodges

Thatched lodges built on a remote site above the Zambezi valley, from the first drilling to the last ramp and rail.

ProjectP-01
LocationKanyemba · for IDBZ
WorksLodges · new build
YearTBC

02 / 05 · Renovation

Masvingo
Hospital

A working hospital block stripped back, re-planned and handed back with new finishes, glazing and canopy.

ProjectP-02
LocationMasvingo Provincial Hospital
WorksDental block refurbishment
YearTBC

03 / 05 · Renovation

Vumba
Heights

A long stone-and-render building in the mountains, its roofs and elevations put back in order.

ProjectP-03
LocationVumba · for ZRP
WorksRefurbishment
YearTBC

04 / 05 · Civil

Sunway
City

A long boundary wall raised course by course along a new road, with the manholes and drainage beneath it.

ProjectP-04
LocationSunway City, Harare
WorksBoundary wall · drainage
YearTBC

05 / 05 · Residential

Damofalls
Residence

A staff house and its walled yard, built and finished down to the bathroom tiles.

ProjectP-05
LocationDamofalls, Ruwa
WorksStaff residence · new build
YearTBC

Registers, works and years drafted · confirm before publishing

03One job · P-01 Kanyemba Lodges

One job,
week by week.

Ground to keys in twenty-six weeks, as the site diary recorded it.

  1. Week 01 / 26

    Ground broken

    Drilling on site from the first week, through the night where the programme needed it.

    A drilling rig working under lights at night on the Kanyemba siteIDBZ Kanyemba
  2. Week 09 / 26

    Walls up

    Face-brick walls built to the line, with window frames set as the courses rose.

    A face-brick lodge shell with its window frames inIDBZ Kanyemba
  3. Week 16 / 26

    Under thatch

    The roof timbers raised and thatched while the ramps and terraces were formed below.

    A lodge under its new thatch, poles still standing round itIDBZ Kanyemba
  4. Week 22 / 26

    Finishes

    Tiles, glazing and paint: the part the guests will live with, given the time it needs.

    A finished lodge room with tiled floor and full-height glazing under the thatchIDBZ Kanyemba
  5. Week 26 / 26

    Keys

    Snagged, tested, cleaned and handed over, in the week the programme said it would be.

    A finished lodge with its access ramp and timber railIDBZ Kanyemba

26 weeks · ground to keys · weeks drafted, confirm before publishing

04Location plan

Where wehave built.

Every site is tied back to one office, and answers to it.

Sites from the project files · confirm before publishing

30°00′E31°00′E32°00′E33°00′E16°00′S17°00′S18°00′S19°00′S20°00′SN050100 km11RuwaSite office · Damofalls residence0 km22HarareRed Cross · Sunway City · Hydon Park27 km33ChinhoyiMunicipal staff house125 km263 km44KanyembaLodges · for IDBZ263 km55MvumaBoundary wall · for ZETDC171 km66GutuRural home196 km77MasvingoHospital · RDC offices245 km88VumbaHeights · for ZRP210 kmLocation plan · 1:3 000 000 · grid 1°00′00 sites · one contractor

05Handover

Build it
once.